Construction & Infrastructure 

OUR INDUSTRIES

CONSTRUCTION & INFRASTRUCTURE 

MASS RAPID TRANSIT TUNNELING WORK

During tunneling work where the location is not being supported with town power, a temporary source of power from generators can be useful to drive the boring machines.

UPR engineers work with clients on their specifications to design and provide comprehensive solutions, taking into the account of the starting current to drive the bore bits, distance of travel and operating pattern.

In a built up area where sound level is a concern to the environment, UPR delivers its excellent sound insulated generators to meet with this criteria.

Main features include:

  • Silence generator units to achieve noise compliance
  • Quick set up and capable for fast relocation if required
  • Power engineering design with complete power solution
  • Transformer for providing higher voltage setting required for operating boring machine
  • Switchgear protection for safety
  • Provision of medium voltage cables and connections

DATA CENTRE

Utilisation of load banks to test and discharge battery banks of the Uninterrupted Power Supply (UPS) is frequently conducted. In addition, UPR’s large capacity load banks may also be deployed to test the function of the control system as well as the multi-megawatts of standby generators installed as the backup power source at Data Centre.